亚洲愉拍自拍视频一区,在线观看极品裸体淫片av,中文字幕一区二区三区人妻精品,精品日产一区2区三区,一区二区av日韩免费,能看的网站中文字幕不卡av,亚洲高清一区二区三区在线观看,91国产自拍视频在线,日本不卡一区二区高清中文,精品蜜桃av一区二区三区

Shaker installation of rock particles
The main structure of the rock particles, the following five categories
  Body: body is an independent rectangular cylinder on the device closed bearing and powder bucket connection, pink bucket toward the body, under which is equipped with a V-shaped chassis, the ground a broad and flat, so be fitted with can be positioned anywhere indoor use.
  , Particle manufacturing equipment: rotating drum lying set the bucket in the powder below, front and rear bearing supports for the inverted rotary rack drive, the end of the bearing cap is movable assembly and disassembly, as long as the spin under a wing nut, the bearing cap and rotating drum to be pulled out, place the roller at both ends of the system has a convex side ring, embedded bearing indoor, that is not to make the oil penetrate the powder will and will not be bonded plugged.
  Gearbox: using a worm gear, the ratio to 1:12, the box can be stored oil to ensure good lubrication of gear and no noise, endoscopic observation, observation of the functioning of the oil reserves on the box, worm gear outer end, equipped with eccentric shaft to drive the rack for reciprocating movement.
  4, folder sieve tube: device on both sides of the rotary drum, steel pipe manufacturing, in the middle to open a long trough, both ends of the embedded slot of the screen, turn the flower-shaped hand wheel will screen wrapped in a cylindrical rotating drum hand wheel, gear shore, tightness can be adjusted.
  5, the motor frame: a screw bolt firmly, the motor mounted on the iron, when the rotation of the screw bolt, the motor up and down movement for adjustment of belt.
  , Rock particles, machine vibration sieve installation and commissioning steps and shaker install debug Note
  1.1 rock particles prior to installation, the first reference to the packing list to check parts are complete and damage.
  1.2 refer to the installation diagram for installation, chassis which support must be horizontally mounted on the foundation, the basis should have sufficient stiffness and strength to support all the dynamic load and static load of the shaker.
  1.3 can make use of the screen box trunnion lifting screen, not directly linked to the exciter on the lifting of the entire sieve.
  1.4 Installation of the rock particles, machine screen, make sure to kept to a minimum 75mm gap between the screen box and hopper, trough a class of non-moving parts.
  1.5 rock particles after installation, around the screen surface level, otherwise, the spring seat and bearing pad of thin iron plates to be adjusted.
  1.6 The spring must be in a vertical state, the spring fixator in the ear axis of the screen box.
  1.7 shaker drive direction as, standing on the feed side, the face of the material flow direction, and observe the motor position, the left hand side to left to drive, right hand side for the right to drive. The shaker symmetrical design, both sides pulley. Replace the motor position to drive the direction of change around.
  1.8 to ensure that the V-belt tension the full amount of the adjustment of the two pulley face is adjusted in a plane.
  1.9 test before hand (or other method) rotating exciter. Flexible rotation, no jamming phenomenon, before starting the machine.
  1.10 rock particles, install the adjustment is completed, should be not less than two hours of no-load commissioning requirements of the smooth operation, no abnormal noise bearing maximum temperature does not exceed 75 ℃.
  1.11 according to the site usage through appropriate changes in the number of eccentric block to adjust the amplitude of the size of, in order to achieve the desired screening effect
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

亚洲av成人一区二区三区本码| 麻豆人妻无码性色AV专区| 国产91九色视频在线播放| 麻豆人妻性色av专区0000| 内射人妻少妇无码一本一道| 精品福利视频一区二区三区 | 日日高潮夜夜爽高清视频| 国产乡下妇女做爰| 国产96在线 | 欧美| 91成人午夜性a一级毛片| 麻豆视频在线观看免费在线观看| 人妖av手机在线观看| 久久精品国产精品国产精品污| 999国产一区在线观看| 亚洲女同一区二区久久| 国产精品久色婷婷不卡| 99国产精品久久久蜜芽| 国产A√无码专区| 日本一区不卡高清在线观看| 国产一品二品精品在线| 国产精品r级最新在线观看| 婷婷丁香五月亚洲| 在线观看人成网站深夜免费| 国产极品裸体av在线激情网| 涩涩鲁精品亚洲一区二区| 久久天天躁狠狠躁夜夜躁2014| 怡春院欧美一区二区三区免费| 久久精品国产亚洲精品色婷婷| 久久一区二区三区久久久| 国产av无码专区亚洲av中文| 色婷婷综合激情| 少妇又色又爽又刺激的视频| 久久久久久av无码免费网站下载| 国产熟女高潮视频| 国产精品美女久久久浪潮av| 亚洲av色图一区二区三区| 老太脱裤子让老头玩xxxxx| 亚洲免费不卡| 亚洲香蕉久久一区二区| 日本真人边吃奶边做爽动态图 | 国产一毛片|