亚洲愉拍自拍视频一区,在线观看极品裸体淫片av,中文字幕一区二区三区人妻精品,精品日产一区2区三区,一区二区av日韩免费,能看的网站中文字幕不卡av,亚洲高清一区二区三区在线观看,91国产自拍视频在线,日本不卡一区二区高清中文,精品蜜桃av一区二区三区

Universal grinder, mixer Groove, rock particles, machine maintenance, maintenance knowledge Daquan
Universal grinder use:
  A universal grinder for the entire packing, unpacking, moved to the appropriate location to place a smooth power, to trial.
  2, should be checked prior to use mechanical transmission parts loose and other irregularities, universal grinder running direction shall be consistent with the direction of the arrow.
  3, when used to load test for 1-2 minutes, to be seen no abnormal phenomenon before feeding, feed should be gradually increasing the amount of logistics, and observe the motor power consumption of power and functioning at any time, to be feeding the power balance in normal operation certainly die cutting gate work.
  4, the half-way as a result of material too moist knot stick too much, the impact of flour, drying materials should be or replace coarse sieve.
  5, replace the sieve just the front cover open can, install the front cover should pay attention to both sides of the hand wheel is elastic, to ensure that the front cover and the casing seal.
  6, the parking should be preceded by stop feeding, so universal grinder to run for 5-10 minutes and then stop. In order to reduce the residual materials.
  Universal grinder Cautions:
  1, check the crush cavity foreign body (before the boot must be empty), power.
  2 Tighten the roof and smash the cavity of the butterfly nut.
  , Start the motor, empty rotation for 1-2 minutes, then playing from the feed tray gradually feeding materials, the feed should not be too much too fast.
  4, in case of jammed materials, the motor does not turn, immediately turn off, to prevent motor burn, to be cleared by the card materials, you can continue to use.
  5, universal grinder during use is strictly prohibited open the cover and the hand inserted into the crush cavity.
  6, the universal grinder of dry mill, and should not be crushed wet material and oily matter.
  7, depending on the desired switch to a different screen.
  Maintenance and repair of Groove Mixer
  Often use the Groove Mixer reducer shall be every three months a new oil replacement should the reducer after cleaning with new oil.
  Groove Mixer parts regular monthly check 1-2 times, check the site for the worm, worm, bearings, oil seals, all working parts are flexible, fastener loosening, irregularities should be promptly dealt.
  During use, such as Groove Mixer vibration anomalies or makes unusual sounds, you should immediately stop check.
  Groove Mixer electrical control components shall be kept clean and sensitive, and found that the fault should be repaired in time.
  Stirrer assembly and disassembly when light demolition, stable equipment, light, and to avoid distortion damage.
  After use, the various parts of the residual materials should brush Jing Groove Mixer, disabled for a long time, must be Groove Mixer all wipe clean the parts coated with anti-rust oil, tarpaulin cover.
  Rock particles, machine maintenance instructions:
  Regularly check swing particles machine parts, conducted once a month, check the worm, worm, lubrication on the bolt, bearings and other activities segment is rotating flexible and wear, and found that the defects should be repaired in time, shall not be reluctant to use.
  2, rock particles, machines should be placed on a clean dry indoor use, and shall contain acids and other corrosive gases to the body circulation spaces in the atmosphere.
  Rotating drum, rock particles machine after use, or stop, should be removed for cleaning and brush remaining powder will clear bucket, and then installed and ready for the next use.
  Automatic granule packing machine Lubrication:
  1, the box part of the rock particles, equipped with a fuel gauge, before driving all the grease once halfway according to the bearing temperature rise and functioning of the addition.
  , Worm gear box must be long-term storage of oil, the oil surface height for the worm all invasive oil, such as the frequent use of every March, a new oil once a provincial judge bottom drain plug, you can put the oil.
  3, in the rock particles to refuel, do not make the oil overflow cup, not to flow to the rock particles around the machine and ground. Because the oil is easy to material contamination, affecting product quality.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

久久夜色精品国产噜噜麻豆| 玩弄放荡人妻一区二区三区| 俺来也俺去啦久久综合网| 国产裸体歌舞一区二区| 精品无码一区二区三区爱欲| 国产成人亚洲一区二区| 激情五月开心五月麻豆| 一本久道高清视频在线观看| 亚洲天堂成人av在线观看| 草草影院ccyy国产日本欧美 | 嫖妓丰满肥熟妇在线精品| 人妻丰满熟妇av无码区不卡| 国产一区二区波多野结衣| 中文成人无码精品久久久不卡| 无码任你躁久久久久久老妇| 牛牛在线视频| 国产肉体xxxx裸体137大胆| 亚洲av日韩精品久久久久久久 | 国产午夜精品综合久久久| 加勒比av在线一区二区| 久草视频在线播放免费| 亚洲av永久无码精品网站在线观看| 国产青青草自拍视频在线播放 | 亚洲综合无码一区二区三区 | 国产男女猛烈无遮挡免费视频网址| 亚洲一区二区三区偷拍自拍| 日韩av在线免费观看不卡| 蜜桃噜噜一区二区三区| 亚洲女同同性一区二区| 男女男精品视频网站免费看| 国产精品理论片在线观看| 无码人妻久久久一区二区三区| 久久国产成人精品av| 一本色道久久88亚洲精品综合| 国产无遮挡又黄又爽免费网站| yw尤物av无码国产在线观看| 和外国人做人爱视频| 台湾佬娱乐中文22vvvv| 五月婷婷俺也去开心| 国产成人精品av| 大地资源中文第三页|